France – Survey design services – The purpose of this contract is a project management mission (MOE) for the railway development of the Brégaillon freight terminal
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The mission includes carrying out pre-project/project studies (APO) and project management with a view to carrying out work to develop railway installations on the Brégaillon Sud port site. Carrying out pre-project and project studies (APO) for a 1st phase of works; The carrying out of work consisting of the creation of 2 additional new railway tracks (for a total of approximately 800m), the installation of 4 track switches, the installation of a crossing and the resumption of the platform on all of these constructions; Carrying out APO studies for a 2nd