OPŠ 09/2024, VT Ostravice, repair of LB tear, km 11,060 - 11,230
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the public contract is the rehabilitation of the LB breach and the repair of the bank fortifications on the left bank of the Ostravice VT in km 11,060 – 11,230 to the original parameters. • Construction work will be carried out on the basis of protocol number 260/222/004/OPR in terms of the removal of flood damage in the given location. • All work will take place in the bed and on the banks of the water course in the given locality. Before the work starts, the fishing crew will be caught. Security will be provided against the leakage of dangerous substances into the water course (installation of a bore wall). • Subsequently, the damage will be rehabilitated and the bank fortification will be repaired to the original parameters according to the attached project documentation, i.e. the construction of the left bank fortification in the section km 11,060 – 11,230, where part of the original soil will be excavated for the implementation of a new stone throw, which will form a new stabilization foot of the slope. Excavated soil will be moved to the excavation area. Subsequently, the footing with a weight of approx. 500 - 1000 kg will be stone thrown. The excavation area will be filled with suitable soil - unsorted river gravel (from the investor's intermediate landfill). Leveling of the screed and sand filling will be carried out in the place of the stone fortification (levelling) with wedging with a stone weight of 200-500 kg. • Access to the construction site is via the existing local and purpose-built roads along the Ostravice waterway, which will be returned to their original state after the works are completed. • Basic parameters of the repair: - Total length of the treated section: 170 m. - Repair of the shore fortification including the heel in the form of a level with wedging and throwing from quarry stone weighing of individual stone 200-500kg and 500-1000kg with an area of approx. 912.60 m2. Place of performance: Ostrava Contract type: Stavební práce Procedure regime: VZ malého rozsahu Awarded to: Lesostavby Frýdek-Místek a. s. Awarded contract value: 4,394,997.84 CZK