Germany – Technical control services – S21, Bonatzbau - Bauüberwacher_Bahn_VVBAU
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The Bonatz building is being redesigned by converting the terminus station into a lower-lying through station. Level 0 below the terminal platform hall will be expanded into a new distribution level for the flow of people to the distribution walkways of the new station hall, while at the same time it represents the internal access level for the commercial areas on levels 0 and +1. From Arnulf–Klett–Platz, level 0 can be reached through the large and medium ticket halls. With the completion of the new underground station hall, Strasbourg will be built at the same level as the current level 1