Energy Saving Measures in Campus Buildings and Their Barrier Accessibility Solutions
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the public order and construction plan is: • 1) improvement of the energy standard of buildings in the area (insulation of walls and roofs, adjustment of the microclimate of selected areas); • 2) modifications associated with ensuring barrier-free use of the building and area (ensuring the necessary access and location of reserved parking spaces); • 3) functional expansion and improvement of operational contents (extension of changing rooms, building of fitness, reconstruction of the roof of gymnasiums); Breakdown of the set of buildings into objects and technical and technological equipment: • SO.01 – Object of school pavilions • SO.02 – Fitness • SO.03 – Gymnasiums • IO.01 – Drains and area rain sewers • IO.02 – Area LV connections The concept of construction technical and technological solutions includes the following main solutions by groups of objects or individual objects: SO.01 • insulation of all facades and roofs of pavilions No. 1, No. 2 and No. 3, including connecting corridors; • addition of new changing room areas in connection with the connecting corridors between the individual pavilions; • replacement of some unsatisfactory window coverings with new ones (especially sanitary facilities); • design of forced central ventilation for classrooms in all pavilions (VZT units); • installation of photovoltaic panels in the scope of energy management on the roof level of the pavilions; • replacement (installation of new) technologies for vertical movement (elevators) in all three pavilions in extended positions of the existing ones; • minor construction modifications within horizontal communications (corridors, halls and vestibules), in favor of the elimination of height and width barriers (replacement of doors, new ramps, removal of high thresholds); • minor structural modifications to vertical staircases (slip resistance, contrast between entry and exit steps); • addition of technologies needed to ensure the comfort of the visually impaired and blind (orientation, information system, two-way communication devices, system of acoustic elements); • modification of existing surfaces (horizontal and vertical) in favor of ensuring sufficient visual contrast for better o Contract type: Stavební práce Procedure regime: otevřené řízení Awarded to: BBP Stavby s.r.o. Awarded contract value: 243,976,831.51 CZK