Campus VOŠ and SPŠE Pilsen - services of the general designer - stage I
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the public contract is the services of the general designer (hereinafter referred to as "GP") for the construction project "VOS AND SPŠE CAMPUS PLZEŇ - STAGE I". Stage I includes the following buildings: 1.2. – INSULATION OF SCHOOL PAVILION INCL. PHOTOVOLTAICS 3.1. – REPLACEMENT OF ROOF BRACKET AND INSULATION OF THE GYM – INCL. PHOTOVOLTAICS 3.2. – NEW FITNESS 4.3. – CLASSROOM EXTENSION - DINING FACILITY INCLUDING BISTER 0.3. – ACCESSIBILITY 1.1. – EXTERIOR ADJUSTMENTS OF THE AREA – SPACE BETWEEN THE PAVILIONS AND THE DINING ROOM 1.3. – CONNECTING NECK The task of the GP will be to draw up subsequent stages of project documentation, i.e. documentation for the authorization of plans, documentation for the execution of constructions, which will also be documentation for awarding public contracts (for the selection of a construction contractor) and documentation for the actual execution of the construction, based on the already prepared studies (Appendix No. 2 ZD). The project documentation will be prepared separately for each individual construction of stage I mentioned above, so that the individual constructions can be realized separately according to the financial possibilities of the client. Part of the scope of performance is a comprehensive design of a suitable campus Energy Management system (according to the ČSN EN ISO 50001:2018 standard) for the above-mentioned set of projects, which will enable the gradual expansion of the system to the entire campus. The goal of energy management is to manage energy consumption in order to reduce operating costs and environmental impacts in the long term. GP implements the proposed measures leading to the reduction of consumption in all stages of the project documentation, which are the subject of this order. When implementing energy management, the procedure will be in accordance with the methodological instructions of the State Environmental Fund (Methodical instructions for meeting the requirement for the introduction of energy management). Part of the scope of performance is also the provision of project preparation, coordination of mutual continuity between the projects of individual buildings and between professions, all necessary procurement activities for planning permission for all the above-mentioned buildings of stage I, as well as the provision of cooperation during procurement Contract type: Služby Procedure regime: otevřené řízení Awarded to: Masák & Partner, s.r.o. Awarded contract value: 18,979,667.00 CZK