Materials Science Diagnostic Laboratory and Central Utility Building - SNL/CA
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Opportunity Title: Materials Science Diagnostic Laboratory and Central Utility Building - SNL/CA Posting Type: Sources Sought Competition Type: Set-Aside - Small Business NAICS Classification: 236220: Commercial and Institutional Building Construction Business Size Standard: $45M Statement of Work: National Technology & Engineering Solutions of Sandia (NTESS) managing Sandia National Laboratories, Livermore, California, has the need for a subcontractor to perform construction services on two concurrent construction projects, Materials Science Diagnostics Laboratory (MSDL) and Central Utility Building (CUB) at Sandia National Laboratories Livermore, CA (SNL/CA) on a firm fixed price basis. MSDL The scope of work includes construction of a new 10,000 square-foot Materials Science Diagnostic Laboratory building (MSDL). MSDL will be a single-story, steel-framed building located on an unoccupied field south of the existing Micro and Nano Technologies Laboratories (MANTL) complex. The building will include multiple laboratories, clean rooms, supporting mechanical, electrical, and plumbing (MEP) spaces, and exterior hazardous-material storage. MSDL scope also includes site civil infrastructure construction with related excavation, underground utility work and drainage systems for the exterior yard facilities required to support delivery operations, maintenance activities, and fire-vehicle access. Access to the building from the nearest adjacent parking facilities shall be provided in accordance with the most current California Building Code and applicable federal guidelines. CUB The scope of work includes construction of a new 5,000-square-foot Central Utility Building (CUB) and supporting infrastructure to provide heating and chilled water for existing and future campus demand. The CUB will be located on an unoccupied field north of the existing MANTL complex. CUB will be a single-story, steel-framed building with an attached light-framed electrical and IT room. The main CUB space and its mechanical roof will house mechanical equipment and supporting utilities. Exterior MEP equipment will also be installed adjacent to the CUB on equipment pads. CUB scope further includes site civil and access infrastructure for the exterior roadways and walking path necessary to provide personnel and emergency-vehicle access in compliance with applicable California Building Code and federal guidelines. This includes grading, paving, striping, signage, bollards, curbs, utility work and drainage systems. The facility will also be equipped to meet applicable fire, life-safety, and egress requirements. MSDL and CUB construction is to be completed on or before December 30, 2028. REQUIRED RESPONSE: Can the Offeror meet the requirements outlined in the above Statement of Work Summary? Estimated Period of Performance: 04/12/2027 - 12/30/2028 Estimated RFQ Open: 15-Jan-2027 Estimated Award Date: 12-Apr-2027 Procurement Authority: Sandia National Laboratories (operated by NTESS for the U.S. Department of Energy / NNSA).