Get Free Access
TZ Ref No.: TZ-26-1428402
Contract Award Awarded Contract 🌍 International (ICB) Switzerland Infrastructure and construction Railways

BZU 23 Platform elevation P55 Rietheim train station and Koblenz Dorf

Doc ref no. 3802•••
Sector Infrastructure and construction, Railways
Contract Date 06 Nov 2026
Contract Value CHF ••••••
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 06 Nov 2026
Awarded Contract Value: CHF 4,551,010.00

Contract Description

The project plans to convert the Rietheim and Koblenz Dorf train stations to make them handicapped accessible. Rietheim The existing platform along track 1 will be adapted to the elevation P55 using completely new angle elements to provide a usable platform length of 220 m. The existing platform edge (P35) will be partially dismantled. In order to achieve standard-compliant platform widths, a new angle retaining wall must be built, which is founded on micropiles. A nail wall is provided to secure the excavation pit. The existing embankment cut also needs to be adjusted. The existing cable systems and platform drainage will be adapted to the new requirements. The existing waiting hall must be demolished and replaced with a new covered shelter. The platform lighting, sound system and furniture will be renewed. The existing ramp “in Holland” must be adapted to a standard-compliant inclination. The existing contact line masts in the platform area will be demolished and replaced with new masts on the opposite side of the track. There are no plans to adapt the track substructure. Koblenz Dorf The existing platform along track 1 will be adapted to the elevation P55 using completely new angle elements to provide a usable platform length of 220 m. The existing platform edge (P35) will be completely dismantled. The existing cable systems and platform drainage will be adapted to the new requirements. The existing waiting hall must be demolished and replaced with a new covered shelter. The platform lighting, sound system and furniture will be renewed. An existing railway signal must be moved as a result of the platform extension. There are no plans to adapt the track substructure. The planned construction project requires knowledge in the areas of general civil engineering, including plant line construction, platform construction, track construction, earthworks, demolition work in confined spaces, concrete engineering structures, steel structures (shelter) and work under railway conditions

Contract Status
Awarded Contract
Awarded to: Jak.•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 3802•••
Notice Type Contract Award
Contract CPV 45000000
Contract Project Location Switzerland
Contract Value CHF ••••••
Awarded To Jak.•••
Contract Date 06 Nov 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →