Switzerland – Construction work – BZU 23 Platform elevation P55 Rietheim train station and Koblenz Dorf
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The project plans to convert the Rietheim and Koblenz Dorf train stations to make them handicapped accessible. Rietheim The existing platform along track 1 will be adapted to the elevation P55 using completely new angle elements to provide a usable platform length of 220 m. The existing platform edge (P35) will be partially dismantled. In order to achieve standard-compliant platform widths, a new angle retaining wall must be built, which is founded on micropiles. A nail wall is provided to secure the excavation pit. The existing embankment cut also needs to be adjusted. The existing cable systems