Get Free Access
TZ Ref No.: TZ-267E9FC
Contract Award Awarded Contract National (NCB) Czech Republic Infrastructure and construction

OPŠ 09/2024, VT Olše km 23,700 – 23,800 repair LB fortification

Doc ref no. 2175•••
Sector Infrastructure and construction
Contract Date 02 Jul 2026
Contract Value CZK 3.4M
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 02 Jul 2026
Awarded Contract Value: CZK 3,418,865.13

Contract Description

The subject of the performance of the public order is the rehabilitation of the LB breach and the repair of the bank fortifications on the left bank of the Olše VT in km 23,685 – 23,800 to the original parameters. The repaired flow adjustment is near the abutment of the heritage-protected Sokolské hrdinů bridge. • Construction work will be carried out on the basis of protocol number 416/223/090/OPR in terms of the removal of flood damage in the given location. • All work will take place in the bed and on the banks of the water course in the given locality. Before the work starts, the fishing crew will be caught. Security will be provided against the leakage of dangerous substances into the water course (installation of a bore wall). • Subsequently, remediation of the embankment and repair of the shore fortification to the original parameters will be carried out according to the attached simple project documentation, i.e. import of material and backfilling of the embankment from the material deposited at the contractor's interim landfill, laying of the embankment in the form of a level of quarry stone, repair of pavement of quarry stone with grouting. • Access to the construction site is via the existing local and purpose-built roads along the Olše watercourse, which will be returned to their original state after the works are completed. • Basic parameters of the repair: - Total length of the treated section: 115 m. - Repair of the bank fortifications including the heel in the form of a level of quarry stone treated with wedging of the joints of stone fragments: 342 m3. - The shore fortification from the plain will be repaired on an area of: 280 m2. - Coastal fortifications made of stone paving with joint thickness. 200mm will be repaired on the area: 45 m2 of which 19,250 m2 will be a complete replacement including stone. Place of performance: Ostrava Contract type: Stavební práce Procedure regime: VZ malého rozsahu Awarded to: KONSTRUKTIAL s.r.o. Awarded contract value: 3,418,865.13 CZK

Contract Status
Awarded Contract
Awarded to: KONS•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 2175•••
Notice Type Contract Award
Contract CPV 45246000
Contract Project Location Czech Republic
Contract Value CZK 3,418,865.13
Awarded To KONS•••
Contract Date 02 Jul 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →