(b26057-3) Affoltern a. A., Lindenmoosstrasse, stage 2, extension of the SNM / BKP 230 collection center
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The Swiss National Museum (SNM) maintains a unique collection of Swiss cultural assets from prehistory to the present. It makes the collection holdings accessible to the Swiss population and the international public in an attractive form and ensures the proper storage and sustainable conservation and research of the objects. The planned expansion is intended to bring together the existing depots and facilities at one location and to cover the increasing need for space.
In the future, the planned expansion will form an architectural, organizational and technical unit together with the existing building. The existing buildings will be in operation throughout the construction period. Appropriate measures must be taken within the perimeter.
The project location is in the area of sensitive systems (high-voltage lines and railway tracks) as well as in an archaeological zone. During the construction work, the special challenges require an appropriately sensitive and safety-related approach.