Planner maintenance and depot center - Tram-Treno del Luganese (RTTL) network - Priority stage
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The call for tenders concerns the services of the “Progettista Officina” (Maintenance Center and Depot Planner) mandate, which will be responsible for the design for the execution phase of all parts of civil engineering and technical installations, within the framework of the Rete Tram-Treno del Luganese - Tappa prioritaria project. The services of the mandate concern phases SIA 32 (rework, additions and detailed studies), 41, 51, 52 (work control) and 53 in relation to the following works: - Building (structural and non-structural elements), - Building technology (RVCS, electrical systems, photovoltaic systems), - Other technical installations (overhead cranes, washing station, vehicle and trolley lifting system, elevated walkway), - Railway engineering infrastructure inside the building, including railway tracks, - Areas outside the building (parking, infrastructure, etc.). Included are architectural, building physics, environmental engineering and traffic engineering services for the works concerned.
Excluded from this call for tenders are local works management services. For further information on this subject, please refer to the annexes of register 2 of the tender documentation.