Austria – Overhead line construction – Maintenance traction power line - integration into UW Langenwang + fiber optic exchange Ltg.152
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction of 4 high-voltage pylons, replacement of the existing fiber optic earth cable on line 152, and the relocation of a sewage pipe on the S6 (area mast 403)