Austria – Electrical wiring and fitting work – (ProVia ID 156072) Mallnitz-Hintertal; Tauern Tunnel modernization; Tauern Tunnel; Railway technical equipment stage 2
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
As part of the renovation work in the Tauern Tunnel, Stage 2, extensive SFE signal/telecommunications/electrical services are planned as follows: Tauern Tunnel: Creation of a 10kV power supply in the TAUTU from TS3 to TS 1 Mallnitz Energy supply for Telekom and mechanical systems (air conditioning) Creation of orientation lighting (illuminated LED handrail) in the tunnel tube from TS 3 to the south tunnel portal Assembly of electrants and LED buttons in the tunnel tube Cabling work for telematics, overhead lines and signaling technology Grounding measures