Get Free Access
TZ Ref No.: TZ-26-1428983
Contract Award Awarded Contract 🌍 International (ICB) Switzerland Infrastructure and construction

(b26009-5) New construction intervention center Zoll St. Margrethen / BKP 250

Doc ref no. 3476•••
Sector Infrastructure and construction
Contract Date 29 Oct 2026
Contract Value CHF ••••••
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 29 Oct 2026
Awarded Contract Value: CHF 1,249,745.57

Contract Description

Plot number 3396 is located in St. Margrethen SG in the immediate vicinity of the A1 motorway and the border with Austria. The Federal Office for Buildings and Logistics (BBL) is planning to build an intervention center (IVZ) with several parts of the building on the site. The construction project includes a main building and several ancillary buildings with associated technical systems and infrastructure. Water supply Fresh water is supplied by the Technical Works of St. Margrethen. The water hardness in St. Margrethen is on average 17.3°fH, so no water treatment was planned. Dirty water The contaminated wastewater is connected to the St. Margrethen Technical Works. Due to the geometric situation in the building, the drainage takes place via various transfer points to the surrounding sewer system. The processing of the dirty water from the building boundary is carried out by the pipe planner and is not part of the plumbing trade. Rainwater The rainwater that occurs on the roof of Building C, which is covered with photovoltaic modules, is collected in a rainwater tank in the 1st basement of Building C. When the tank is at capacity, the rainwater is channeled into the infiltration areas on the site using a natural gradient. The remaining rainwater from the non-accessible roof areas is also directed into the infiltration system on the area. On the roof of building A there is a roof garden, which is accessible. This “polluted” rainwater is channeled into the wastewater. The processing of rainwater from the edge of the building is carried out by the pipe planner and is not part of the plumbing trade. Gray water use In the 1st basement of Building C there is a rainwater tank for collecting rainwater from the roof drains in Building C. A pressure booster system is used to feed a gray water network, which is distributed to all parts of the building. The gray water is used to flush toilets

Contract Status
Awarded Contract
Awarded to: Equa•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 3476•••
Notice Type Contract Award
Contract CPV 45332400
Contract Project Location Switzerland
Contract Value CHF ••••••
Awarded To Equa•••
Contract Date 29 Oct 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →