(b26054-1) Conversion and renovation of the administration building at Bundesgasse 32, Bern / BKP 112, 211
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
With the renovation of Bundesgasse 32, the building will be transferred to the next life cycle and rooms for the Federal Chancellery will be moderately converted. The conversion and renovation of Bundesgasse 32 is planned to be carried out between 2027 and 2029 after the current users have moved out. Monument preservation The row of houses, which was built in 1874/75, is subject to the monument preservation regulations for Bern's old town and the UNESCO World Heritage Site. The building is being carefully renovated with the consideration of monument preservation. The basic structure of the building largely remains intact. The historical building structure is mainly located on the standard floors in the south-facing room layer, which requires special attention. Structural interventions The structural interventions are limited to adapting the spatial structures on the ground floor for multifunctional rooms and on the attic for modern, open-plan workplaces. Where possible, individual offices should be combined on the standard floors. The existing pollutants are professionally cleaned up. The building and security systems no longer correspond to the current state of technology and will be replaced. The toilet facilities will also be adapted to today's needs. The 6th floor will be accessible to disabled people using a new lift. The sandstone facade is being renovated. It is built in Minergie-Eco, but without certification. Inner-city location Due to the inner-city location, the space available for construction site installation and logistics is very limited, which requires a well thought-out concept. Demolition work / master builder's work Original building materials (such as historical sandstone or wood) are preserved as much as possible, the focus is on preserving the substance and preserving monuments. Due to the building structure being worth preserving, the demolition and construction work must be carried out with the necessary caution and accordingly