Get Free Access
TZ Ref No.: TZ-26-1428918
Contract Award Awarded Contract 🌍 International (ICB) Switzerland Building Infrastructure and construction

(b26054-1) Conversion and renovation of the administration building at Bundesgasse 32, Bern / BKP 112, 211

Doc ref no. 4208•••
Sector Building, Infrastructure and construction
Contract Date 29 Oct 2026
Contract Value CHF ••••••
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 29 Oct 2026
Awarded Contract Value: CHF 1,548,471.59

Contract Description

With the renovation of Bundesgasse 32, the building will be transferred to the next life cycle and rooms for the Federal Chancellery will be moderately converted. The conversion and renovation of Bundesgasse 32 is planned to be carried out between 2027 and 2029 after the current users have moved out. Monument preservation The row of houses, which was built in 1874/75, is subject to the monument preservation regulations for Bern's old town and the UNESCO World Heritage Site. The building is being carefully renovated with the consideration of monument preservation. The basic structure of the building largely remains intact. The historical building structure is mainly located on the standard floors in the south-facing room layer, which requires special attention. Structural interventions The structural interventions are limited to adapting the spatial structures on the ground floor for multifunctional rooms and on the attic for modern, open-plan workplaces. Where possible, individual offices should be combined on the standard floors. The existing pollutants are professionally cleaned up. The building and security systems no longer correspond to the current state of technology and will be replaced. The toilet facilities will also be adapted to today's needs. The 6th floor will be accessible to disabled people using a new lift. The sandstone facade is being renovated. It is built in Minergie-Eco, but without certification. Inner-city location Due to the inner-city location, the space available for construction site installation and logistics is very limited, which requires a well thought-out concept. Demolition work / master builder's work Original building materials (such as historical sandstone or wood) are preserved as much as possible, the focus is on preserving the substance and preserving monuments. Due to the building structure being worth preserving, the demolition and construction work must be carried out with the necessary caution and accordingly

Contract Status
Awarded Contract
Awarded to: Büch•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 4208•••
Notice Type Contract Award
Contract CPV 45111100
Contract Project Location Switzerland
Contract Value CHF ••••••
Awarded To Büch•••
Contract Date 29 Oct 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →