Finland – Construction work – Acting 23 Karvio point, KU, participation request
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The name of the project is "Vt 23 Karvio kohta, KU". The contract is a total price total contract (KU). The contract includes the entire set with all road arrangements, equipment and devices defined in the contract documents.
A more detailed description can be found in the tender documents. Urakka is located in Heinävesi municipality on both sides of the Karvio canal. The exact geographical location of the areas is shown in the construction plan.
In Uraka, a new bridge (S4) will be built over the Karvio canal on highway 23. The new bridge will be built on the north side of the existing bridge. The current bridge will be left for pedestrians and