Project 22.963/1 - Oudenaarde, Hauwaert-Noenendal connection
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Project 22.963/1 - Oudenaarde, Hauwaert-Noenendal connection. - Carrying out topographical operations; - Ensuring the water drainage of the existing sewer system; - Breaking up pipes, inspection pits, roadway and roadside pavements and linear elements; - The construction of sewers in unreinforced concrete pipes of 400 mm and in vitrified clay pipes of 250 mm; - Building inspection pits; - Carrying out house connections to the sewer system; - Constructing overflow construction O1 in cast-in-place (reinforced) concrete; - Carrying out earthworks (for road and sewerage works) and possibly soil improvement through soil replacement; - Construction of a roadway in cement concrete paving and concrete paving stones on a crushed stone foundation and sub-foundation; - Construction of road verges in KWS paving on a crushed stone foundation; - Constructing road verges in cobblestone paving and concrete paving stones on a poor concrete foundation; - Placing prefabricated curbs and water ditches on a poor concrete foundation; - (re)placing traffic signals; - Supplying, installing, replacing and removing site signage; - Supplying, installing, replacing and removing road diversion signaling; - Cleaning, purification and all necessary operations to bring the works into a state of training; - Carrying out planting and sowing works and green maintenance during the guarantee period (2 years); - Carrying out the necessary works during the warranty period (2 years).