Germany – Railway tunnel construction work – SPGK_NBS Wendlingen-Ulm PFA 2.1 a/b, Great Wendlinger Curve, Wendlingen Tunnel
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
• Mining tunnel (1 tube approx. 662.5 m). The production method for the mined tunnel is the shotcrete construction method with split spherical cap or stope/sole jacking • Constructional completion of tunnel using open construction method (1 tube approx. 20m, circumference: walls + ceiling + filling) • Dam (approx. 140 m long, approx. 12,000 m³ volume) • Cut (approx. 120m length, max. depth 10 m) Further measures include the disposal/recycling of the resulting excavated masses, the construction of drainage and underground cable engineering facilities, as well as foundations for overhead line masts