SO 250 Injection corridor, OHO, building no. 5944
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The public contract will be implemented with the participation of funds from the Ministry of Agriculture within the subsidy program 129,500 "Support for flood prevention V." The subject of this public contract is the implementation of a partial construction of an injection corridor, which is part of the right bank binding of blocks of the concrete gravity dam of the Nová Heřminova waterworks and will pass through the entire future concrete dam as part of the overall technical solution. The construction will consist of 7 reinforced concrete blocks separated by dilation and the execution of a layer of infill concrete to the projected level of the plain for the planned realignment of the I/45 road. This includes earthworks, including blasting, which may require permission from the mining authority and the construction of access roads. The subject of the construction is not its equipment - lighting, air conditioning and final finishing of the bottom of the tunnel blocks. A more detailed description of the activities and the subject of performance is given in the Business Terms and Conditions - draft contract for the work (Annex No. 4 of the procurement documentation). A more detailed technical and technological description of the individual components of the subject of this public contract is included in Annexes No. 1 and No. 2 of the procurement documentation. Place of performance: Ostrava Contract type: Stavební práce Procedure regime: otevřené řízení Awarded to: Metrostav CZ s.r.o. Awarded contract value: 63,900,000.00 CZK