Get Free Access
TZ Ref No.: TZ-96B3E9B
Contract Award Awarded Contract 🌍 International (ICB) Czech Republic Bridges and Tunnels

II/610 Stará Boleslav, bridge ID no. 610-018 via D10 after the village of Stará Boleslav

Doc ref no. 1839•••
Sector Bridges and Tunnels
Contract Date 12 Oct 2026
Contract Value CZK 121.0M
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Official Award Result Status: Contract Awarded
Award Date: 12 Oct 2026
Awarded Contract Value: CZK 69,443,843.18

Contract Description

The subject of the public contract is the demolition of the existing bridge and No. 610-018 and the construction of a new bridge building. The supporting structure of the new bridge consists of a continuous beam structure with two spans of 31.0 + 31.0 m, composed of prefabricated post-tensioned beams with a post-concreted, monolithic, jointed slab. Prefabricated beams are a "specified product" in the sense of Act No. 100/2013 Coll. and Government Regulation No. 163/2002 Coll. The specific type and number of beams (as well as the exact thickness of the joint plate) depends on the bridge builder and will be determined in the RDS. Beams 1.60 m high made of concrete min. C35/45-XF2 and a 0.22 m thick composite slab of C30/37-XF2 concrete. The slope of the upper surface of the slab is central 2.5% to the right, 0.250 m from the curb a trough is created with a counterslope of 6%. The width of the supporting structure is 14,250 m. The supporting structure will be finished at both ends with monolithic reinforced concrete crossbars made of C30/37-XF4+XD3 concrete 2,120 m high. A monolithic crossbar made of the same concrete will also be created above the pillar. All three cross members reach 0.30 m below the beams and allow the load to be transferred from the beams to the pillars and on the supports to the pair of bearings. In close proximity to the central support, there are existing CETIN cables in the SDP of the D10 motorway, which will be protected during construction and moved to a new position after the construction of the stand (part of SO 401). The contractor's duty is to coordinate the relocation of the CETIN line with the construction of the bridge. Before starting construction work, the contractor shall carry out passporting of the land intended for temporary use during construction and all neighboring land. The plots will be returned to their original condition after the completion of the work, the contractor will submit protocols with confirmation - the consent of the owners of the plots with their condition. Place of performance: Praha Contract type: Stavební práce Procedure regime: nadlimitní Awarded to: Doprastav, a.s., organizační složka Praha Awarded contract value: 69,443,843.18 CZK

Contract Status
Awarded Contract
Awarded to: Dopr•••
View Contract Award
· · Alert

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 1839•••
Notice Type Contract Award
Contract CPV 45221100 45221110 45233142
Contract Project Location Czech Republic
Contract Value CZK 69,443,843.18
Awarded To Dopr•••
Contract Date 12 Oct 2026

Buyer Contact Information

Contact Details Locked

Procurement contact email, telephone, and buyer coordinates are unlocked upon starting your 7-Day Free Pro Trial.

Start 7-Day Free Trial →