Lot 1: Improving the 1.5-Kilometer airport to Pou Bay Bridge Road in Chuuk • Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges in Yap • Lot 3: Replacing the 12-meter Awak bridge
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Specific Procurement Notice Request for Bids, Works Reconstruction of roads and bridges across the Federated States of Micronesia Employer Department of Transportation, Communications and Infrastructure Project FSM Prioritized Road Investment and Management Enhancements Project: P172225 Contract title Lot 1: Improving the 2.4 Km Airport to Pou Bay Bridge Road in Chuuk Lot 2: Replacing Two short-span (6-meter-long) steel and concrete composite bridges in Yap (Road 0.316 Km approaches to the Bridge) Lot 3: Replacing the 12-Meter Awak bridge in Pohnpei (Road 0.330 Km approaches to the Bridge) Country Federated States of Micronesia Loan No. IDA-D7790 RFB No FM-DOTCI-572568-CW-RFB Issued on 22 October 2026 The Federated States of Micronesia has received financing from the World Bank toward the cost of the P172225-FSM Prioritized Road Investment and Management Enhancements Project (PRIME) and intends to apply part of the proceeds toward payments under the contracts: The Borrower shall process payments as defined in the World Bank’s “Disbursement Guidelines for Investment Project Financing” and the project’s Disbursement and Financial Information Letter. Lot 1: Improving the 2.4 Km airport to Pou Bay Bridge Road in Chuuk; Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges (Road 0.316Km approaches to the Bridge) in Yap and Lot 3: Replacing the 12-meter Awak Bridge in Pohnpei (Road 0.33Km approaches to the Bridge) . 1 The Department of Transportation, Communications and Infrastructure (DoTCI) now invites sealed Bids from eligible Bidders for the following lots: Sl. No. Contract Name Contract Description Contract Period 1 Lot 1: Improving the 2.4 Km airport to Pou Bay Bridge Road in Chuuk Construction of 2.4 Km length and 6.4 meter wide Rigid Pavement Road, including 9 Nos. Concrete Box Structures, Lined Side Drains, and associated ancillaries works; and construction of temporary diversion road, cross drainage structures to facilitate traffic movement during construction with safety measures. Construction Period: 365 days Defect Notification Period: 365 days 2 Lot 2: Replacing two short-span (6-meter-long) steel and concrete composite bridges in Yap Construction of 0.316 Km length and 7.16 Meter width flexible pavement road, including the complete replacement of two short-span (6 Meter long permanent steel and concrete composite bridges), construction of 2 Nos. pipe culverts, 2 Nos. concrete box structures (8 Meter x 9.65 Me