Renovation and Thermal Insulation of Roofs and Cladding, Interior Renovation of Roof Premises, Renovation of the Frame of the Montefiore Institute (building B28) – Phases 4.1 - 4.2/ Phase 5 / Phase 6
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The roofs of building B28, which date from the construction of the building (1978), are seriously damaged and need to be renovated. Several B28 roofs have an asbestos underlay in fibrous form, making the renovation of these roofs particularly complex. Asbestos removal is carried out via a framework agreement that ULiège has concluded with an asbestos remover. The present work consists of: - replacing the slate roof covering with zinc sheets and thermal insulation of the roofs; including the replacement of asbestos-containing underlayment; - securing roofs for their subsequent maintenance; - the replacement of slate facade cladding with zinc sheets and thermal insulation of the cladding; - the replacement of the wooden frames included in the new zinc cladding with aluminum frames with new glazing, all with high-performance thermal insulation; - the renovation of existing wooden frames excluding new zinc cladding with new glazing, all with efficient thermal insulation; - replacement of exterior shutters (south facades); - electrical compliance and replacement of lighting fixtures with low energy consumption LED lighting fixtures; - replacement of the outdated fire detection installation; - upgrading ventilation equipment where applicable; - upgrades to lightning rods - interior finishing of premises under roof. This is a contract which includes several phases of work: - phase 4 broken down into 2 parts: phase 4.1 and phase 4.2 = firm tranche - phase 5 = 1st conditional tranche - Phase 6 = 2nd conditional tranche Each conditional tranche will be lifted subject to budgetary availability. The conditional tranches (phase 5 and phase 6) would be lifted respectively around March 2027 and March 2028 subject to budget availability for each tr