Germany – Flatwork – PFA 1.6a-BS2b connection tunnel OTH dismantling BZU
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
In order to enable the connection of route 4700 to the main station, the Obertürkheim tunnel must be built (PFA 1.6a). To build the tunnel, the two routes in Obertürkheim, 4700 long-distance railway Stuttgart-Ulm (HAS) and 4701 S-Bahn, have to be pivoted so that the portal and the subsequent trough can be opened from the direction of Obertürkheim. The pivot lies on the LHS Neckartal cycle path and the Uhlbach, which runs parallel to the railway, and is created by building a catch dam. After the tunnel has been constructed and equipped with the new route leading to the main station