Germany – Switching station installation work – UW Teningen field extension MS + E-coil extension. +HS renewal
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The UW Teningen was built in 1973 and supplies the communities of Teningen and Emmendingen in the Rheinhausen network area. It is located on parcel 3972. (See Appendix 12. Aerial photos). Inventory plans can be viewed in Appendix 23. Inventory documents from documentation query. There are currently 2 HS-MS network groups at the UW Teningen location. Network groups 1 and 2 each have a 40 MVA transformer. Two E-compensation coils (Ib,1=433 A, Ib,2=433 A) are currently installed in the UW Teningen. The following table summarizes the ICE setting value as well as the current and the