Croatia – Construction work for water and sewage pipelines – Construction of the transport pipeline section - II. phase - (PK Lokva - Stinica) - II Stage (total length of the pipeline L»5.6 km)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the procurement is the construction of a parallel transport pipeline on the section PK "Lokve" - PK "Stinica" -II. Phase – II. Stage, from node 4 to node 5, i.e. connection on Stage I, i.e. from station 5+342.64 to station 10+961.94 (according to all the books of the Main Project which is in Annex u), including the implementation of the technical inspection, and the removal of the deficiency within the warranty period.