Croatia – Construction work for water and sewage pipelines – Construction of the transport pipeline section - II. phase - (PK Lokva - Stinica) - I Stage (total length of the pipeline L»4.8 km)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction of a parallel transport pipeline on the section PK "Lokve" - PK "Stinica" -II. Phase – I. Stage, from node no. 6 (connection to the existing pipeline) to node no. 5 of the connection to II. The stage, i.e. from station 10+961.94 to station 15+704.95 to (according to all the books of the Main Project which is an attachment in this tender), including the implementation of the technical inspection, and the elimination of the deficiency within the warranty period.
Related Procurement Opportunities
Similar tenders in Infrastructure and construction, Water and Sanitation, Transportation