Czechia – Intercity railway works – Rehabilitation of the unstable section Valašská Polanka – Horní Lideč in km 20,019 – 21,248
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the work is the construction of the "Rehabilitation of the unstable section Valašská Polanka - Horní Lideč at km 20,019 - 21,248", the aim of which is to eliminate the emergency condition of the railway bed, the rehabilitation of which resulted from a detailed engineering geological survey. The construction includes the reconstruction of railways. top and bottom, new traction line, new power distribution and space preparation for communication and security line cables. Track load class D4, space permeability UIC-GC.