Romania – Dredging and pumping works – framework agreement for: - Lot I Dredging Works - Galati Area; - Lot II Dredging works - Brăila area; - Lot III Dredging works - Tulcea area;
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The depths in the maritime ports must be at least at the level of those ensured on the waterway (Sulina Canal and the maritime Danube) according to international conventions (the 1948 Belgrade Convention and the recommendations of the Danube Commission). Dredging works are necessary when the depths in the operating berths or access channels are lower than those designed, for the safe operation of ships or in any other cases where it is found that the security of the port infrastructure is endangered. CN APDM SA periodically performs hydrographic measurements and checks the berth section