Germany – Works for complete or part construction and civil engineering work – PFA 1.7 / VE-17-BAU-00-300 - PFA1.2 Filderportal - dismantling BE, final manufacturing state including rescue area
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The Filder Tunnel is being built as part of the Stuttgart 21 project. It connects the new underground station with the Filder plain in the south of Stuttgart. The tunnel construction site was mainly accessed from the south. The Filder portal and the construction site facilities area are located in Stuttgart-Fasanenhof, not far from the southern end of Schelmenwasenstrasse. The construction site facility area is around 200 m long Street connected to Schelmenwasenstrasse. It begins at the intersection of Schelmenwasenstrasse and Zettachring. Traffic from the tunnel construction site was already using this road