AZ BL COLO 7528(1) Burro Creek Road
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
AZ BL COLO 7528(1) Burro Creek Road
Project description:
burro creek road is located in mohave county, 71 miles southwest of kingman, arizona. the project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. the project begins at the bridge over burro creek and ends at the cattle guard near the intersection with us hwy 93. the projects length is approximately 1.3 miles.
scope of the work:
the proposed of this resurfacing, restoration, and rehabilitation (3r) project is to improve access to the camping and day use areas at the burro creek campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. the scope of work for this project includes the following major construction activities and items:
pavement rehabilitation: 1.3 miles of roadway resurfacing incorporating full depth reclamation (fdr) and asphalt concrete pavement, along with applicable fog seals and tack coats.
drainage improvements: installation of cross culverts and reconstruction of an existing headwall. additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
earthwork & stabilization: embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
safety & traffic control items: installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
the project is structured with a base schedule a encompassing the primary roadway rehabilitation, and an option x which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
principal work items:
roadway aggregate: 1,600 tons
ditch reconditioning: 2,000 lnft
full depth reclamation: 1.3 mile
asphalt concrete pavement: 3,600 ton
18-inch pipe culvert: 100 lnft
24-inch pipe culvert: 175 lnft
boulder: 100 each
anticipated schedule:
advertisement – october 2026
award-january - 2027
construction – january 2027 through october 2027
estimated cost range:
between $2,000,000 and $5,000,000