Get Free Access
TZ Ref No.: TZ-1000553
Contract Award Awarded Contract 🌍 International (ICB) Hungary Infrastructure and construction Roads and Highways Construction materials

Design EU. KM. 2021-2025. (KD-KM. 18. VÚNY.) 12127 j. Room access road

Doc ref no. 00594296-2026
Sector Infrastructure and construction, Roads and Highways, Construction materials
Contract Date 31 Aug 2026
Contract Value Undisclosed
Contract Intelligence
AI opportunity notes and scope analysis for this contract award

A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.

Sign in to unlock Bid Fit & AI Opportunity Intelligence

TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).

Contract Description

Design EU. KM. 2021-2025. (KD-KM. 18. VÚNY.) 12127 j. Room access road
The task of the Winning Bidder is to perform the framework agreement under the framework agreement number KB-2021/0000838/005/00 on the subject Renovation works of the national road network 2021-2025 - Part 5: Central Transdanubia and Central Hungary region within the framework of the enterprise contract no. 12127 j. between kilometer sections 0+005 - 0+782 of the Szob access road - on an intervention length of 777 meters - carrying out construction works including pavement renovation in accordance with the technical specifications that are part of the other public procurement documents and the plans provided, according to the main quantitative data below: Lot number Name Unit Quantity 1 GENERAL COSTS 10-20 Preparation of an implementation plan main and side road km 0.777 10-26 Temporary traffic diversion construction, demolition (main and side road) km 0.777 10-33 Preparation of temporary traffic diversion plan side road km 0.777 2 UTILITIES 23 ROAD, SPACE AND PUBLIC LIGHTING 23-1 Road, Square and street lighting 23-130 Placing under protection m 16.00 23-150 Construction of a column pc 4.00 23-170 Carrying out light measurement, handing over the light measurement report pc 1.00 24 SEWER LINES 24-1 Dismantling water and sewer lines 24-130 Demolition of a sinkhole pc 1.00 24-2 Water and Replacement/construction of rainwater channels 24-231 Construction of rainwater channel from plastic pipe NA < 40 cm m 26.00 24-232 Construction of rainwater channel from plastic pipe NA 40 cm m 153.00 24-238 Construction of rainwater cleaning manhole pcs 9.00 24-240 Construction of water sink manhole pcs 4.00 24-244 Level installation of water-absorbing grids pc 5.00 24-256 Cleaning of water-absorbing manholes pc 5.00 24-3 Making pipe reinforcements 24-342 Level installation of utility covers pc 18.00 24-343 Draining head ⌀20 - up to ⌀ 60 pc 1.00 3 ROAD CONSTRUCTION 31 PREPARATORY WORKS 31-110 Area cleaning 31-113 Brush and shrub removal m2 105.00 31-160 Other area preparation works 31-163 Establishment and demolition of temporary bus stops pc 5.00 31-2 Demolition works 31-220 Demolition of road surfaces 31-221 Demolition of asphalt pavements with slabs m2 1,932.50 31-233 Milling of asphalt pavement thickness>20mm m3 37.00 31-240 Demolition of other pavements 31-241 Demolition of sidewalk pavements m2 1,166.00 31-246 Demolition of large cobblestone paving with bedding. m2 84.00 31-250 Demolition of road bases 31-253 Demolition of scattered and macadam road bases m3 685.45 31-260 Demolition on a small surface 31-270 Demolition of raised, inclined or sunken curbs m 544.00 31-3 Surface preparation 31-320 Drilling works 31-321 Hole drilling m3 1.00 31-4 Leveling and replacement of utility covers 31-412 Leveling manhole covers pc 12.00 31-6 Site preparation earthworks 31-631 Dismantling and removal of benches m3 4.00 32 EARTHWORKS 32-0 Other earthworks 32-004 Soil separation layer no installation of woven GRK-3 type geotextile m2 2,390.50 32-010 Triaxial rigid junction geogrid <=150/150 m2 2,390.50 32-6 Earthwork cut 32-613 Removal of excess soil from the cut m3 528.83 32-7 Earthwork upper part 32-715 Earthwork upper part made of M63 m3 1,161.65 33 Paving bases 33-0 Paving bases (without binder) 33-001 Paving base without binder marked M22 m3 86.05 33-004 Paving base without binder marked M63 m3 668.55 33-1 Paving bases (hydraulic binder) 33-141 CKt-2 hydraulic binder pavement base m3 14.00 34 ROAD SURFACES 34-1 Asphalt base layer 34-132 AC-22 binder (mF) GmB 45/80-55 or PmB 45/80-65 m3 27.68 34-4 Binding layers 34-444 AC-22 binder (mF) GmB 45/80-55 or PmB 45/80-65 m3 342.68 34-5 Wearing layers 34-50 Other wearing layers 34-503 Installation of modified bitumen sealing tape m 844.00 34-51 Asphalt wearing layers 34-512 AC-8 abrasive (N) B 50/70 or B 70/100 m3 60.00 34-522 AC-11 abrasive (F) B 50/70 m3 5.00 34-523 AC-11 abrasive (mF) GmB 45/80-55 or PmB 45/80-65 m3 267.10 34-6 Construction of concrete pavements 34-641 Construction of two-layer concrete pavement reinforced in the joints of CP4/2.7 and with a different composition per layer with a washed surface m3 16.00 36 OTHER ROAD CONSTRUCTION WORKS 36-231 Construction of an elevated border from prefabricated elements or in monolithic design m 644.00 36-233 Enhanced drainage (K) production of edging from prefabricated elements or in monolithic design m 65.00 36-235 Production of sloped edging from prefabricated elements or in monolithic design m 7.00 36-237 Creation of sunken edging from prefabricated elements or in monolithic design m 116.00 36-242 Garden edging m 56.00 36-412 Paving stones 8 cm long. of concrete paving stones m2 55.00 36-416 Spreading of bedding gravel 2/4 m3 2.00 37 FINISHING WORKS 37-110 Filling of bench and/or dividing strip with filling material m3 2.00 37-132 Raising to entrance level m2 6.00 37-111 Bench and/or composting of dividing strip m3 2.00 37-411 Protection of earthworks by sowing grass seeds on a flat surface m2 257.00 4 WATER CONSTRUCTION 41 DEMOLITION WORKS 41-114 Demolition of grid gutters m 13.00 42 Ditches and gutters 42-307 Cleaning and repair of concrete-lined ditches m 245.00 42-402 Drain cover replacement and leveling pc 1.00 42-421 Ditch lining with prefabricated concrete slabs (creating additional concrete structure) m2 27.00 42-455 Grid gutters m 43.00 44 TOOLS 44-106 Vb.manhole cleaning, repair pc 1.00 45 OTHER WATER CONSTRUCTION WORKS 45-202 Construction of long-flowing seepage body m3 51.57 5 BRIDGE CONSTRUCTION - Structure construction 57 BRIDGE REPAIR WORKS 57-3 Repair of masonry and coverings 57-310 Brick and repair of gaps in stone masonry, copper coverings m2 1,175.00 57-312 Surface protection of stone materials by hydrophobization m2 1,175.00 7 TRAFFIC TECHNOLOGY 71 DEMOLITIONS 71-110 Demolition of KRESZ signs 29.00 71-120 Demolition of KRESZ sign columns 23.00 71-308 Demolition of guide rail m 38.00 72 ROAD ACCESSORIES - RETAINING SYSTEMS 72-101 Road steel tape barrier with one-sided N2 retention level m 12.00 72-300 Steel tape barrier concrete end element base body run pc 2.00 72-352 Reflective double-sided prism with RA2 film for strip railing pcs. 411.00 73 VERTICAL SIGNS 73-100 Placement of new KRESZ signs pc.

Days to Deadline
41 days
Closing: 28 Nov 2026, 00:00

Consortium & JV Partners

Matched
Need a Co-Bidder or Subcontractor?

Forming a Joint Venture increases technical eligibility and financial bonding capacity.

Post / Find JV Partners →

Key Contract Details

Doc ref no. 00594296-2026
Notice Type Contract Award
Contract CPV 45230000, 45233120, 14100000
Contract Project Location Hungary
Contract Value Undisclosed
Contract Date 31 Aug 2026
Contract Deadline 28 Nov 2026

Buyer Contact Information

Contact Details Locked

Nodal officer email, telephone, and website coordinates are unlocked upon free sign up.

Unlock Contact Details (Free) →