Roofing work, extension of Limeshain primary school in Himbach, 63694 Limeshain Roofing work, extension of Limeshain primary school in Himbach, 63694 Limeshain
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Roofing work, extension of Limeshain primary school in Himbach, 63694 Limeshain Roofing work, extension of Limeshain primary school in Himbach, 63694 Limeshain
General construction description Here: Shell construction The extension to the primary school in Limeshain Himbach is a solid construction and includes the all-day area, including the cafeteria, the library and some classrooms. On the 2nd floor there is a wooden frame staggered floor in which the technology and storage rooms are located. The building is accessed via two external staircases and accessibility is achieved with an elevator. The plan is to access the extension via a connecting corridor to the existing building. The connecting corridor will be built right up to the existing building and the breakthrough will be put into use in a later, separate measure to the existing building. The work is carried out while the school is in operation. Trade description: Building dimensions: GFA 2,600 m² gross floor area, BRI 10,300 m³ gross volume, 1,200 m³ excavation pit, 600 m³ pipe trench excavation, 320 m empty pipe DN 100, 240 m³ foundation concrete, 1,100 m² floor slab, 850 m² reinforced concrete external walls with two-sided formwork, 400 m² reinforced concrete internal walls with two-sided formwork, 2,200 m² reinforced concrete ceiling with formwork, 1250 m² masonry as KS plan element. Expected execution deadline: week 18/26 - week 12/27 You are bound to your offer until May 18, 2026, because after evaluating all offers, and any additional demands and clarifications on the offers, we must submit the construction contract to the responsible political committee for approval in order to make a decision. Only then can the information be sent to the bidders who were not considered and after this deadline the contract can be awarded. Accordingly, the execution deadline could also be postponed by 2-3 weeks. The subsequent contractor receives an award letter which also shows how he should issue the invoice in accordance with the clients specifications. Further information describing the procurement and the process, such as: B. Submission of offers and award criteria can be found in the tender documents and this contract notice.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Education and Training