The main component of the works to be executed under the contract is dredging of 07 (Seven) places in the Pussur Channel (Total Length is about 23.4 km and approximate volume is 21.60 million cubic meter) at the stretch Mongla Port to Harbaria by Trailing Suction Hopper Dredger & Cutter Suction Dredger and disposal of dredged material in designated dumping compartment, construction of earthen & geo-tube embankment around disposal area, necessary pre/ post/ interim hydrographic survey.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Official Contract Award: The main component of the works to be executed under the contract is dredging of 07 (Seven) places in the Pussur Channel (Total Length is about 23.4 km and approximate volume is 21.60 million cubic meter) at the stretch Mongla Port to Harbaria by Trailing Suction Hopper Dredger & Cutter Suction Dredger and disposal of dredged material in designated dumping compartment, construction of earthen & geo-tube embankment around disposal area, necessary pre/ post/ interim hydrographic survey.. Awarded Contractor: Jiangsu Haihong Construction Engineering Company Limited – China Civil Engineering Construction Corporation JV. Contract Value: 7261019835.6 BDT. Invitation/Proposal Ref: 18.14.0158.427.14.450.20 –565; Date: 28/12/2020. Package No: 18.14.0158.427.14.450.20-440; Date: 22/07/2020. Ministry: Ministry of Shipping. Agency: Mongla Port Authority. Procuring Entity: Chairman of Mongla Port Authority represented by Project Director.. Procurement Method: ICT. Source of Funds: Development Budget GOB.
Related Procurement Opportunities
Similar tenders in Infrastructure and construction