L124: Electrical equipment and external cable pulling for the new LUTTRE traction substation
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
This contract is a works contract. The purpose of the company is to carry out the work as defined by the plans submitted, the attached quantity survey and the various reference award documents. It includes, in main order: • studies, the development of plans and documents in accordance with article 36 of the Royal Decree of 14.01.13 of this CSC; • the supply of all necessary equipment in accordance with the plans submitted and following the technical conditions of these special specifications; • the connection and external cabling (MV, 3 kV, LV, control-command, etc.) of electrical equipment supplied by Infrabel as part of a separate supply contract (transformers, rectifiers, MV substation, 3 kV substation, etc.) • the supply and installation of LV cabinets (interior and exterior); • the supply and installation of 110 V DC batteries; • the installation of lighting, power sockets, • the LV electrical connection of various devices delivered with the buildings (heating, heat pumps, etc.); • the tests, the perfect repair and commissioning of the substation in collaboration with the company responsible for supplying the equipment delivered by In-frabel; • all adjustments, checks and adaptations until final acceptance; • maintenance, parts, service hours and travel costs during the warranty period; • the coordination of the work with its subcontractors and the suppliers of the various materials (§14 of article 79 in the 2nd part of the CSC) • the work of pulling cables into pipes in the tracks, making junctions The tenderer acknowledges having provided, in the sum fixed in its offer, the necessary supplies for the commissioning of the installations in impeccable conditions and having established its price without having omitted or forgotten anything. The contractor must carry out all the studies necessary to carry out the installations which would not have been