Hiring a specialized company to carry out engineering work, under a semi-integrated contracting regime, comprising the preparation of executive architectural and engineering projects and the execution of the work on the Hospital's Waste Shelter
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Hiring a specialized company to carry out engineering work, under a semi-integrated contracting regime, comprising the preparation of executive architectural and engineering projects and the execution of the work on the Waste Shelter of the Maternal and Child University Hospital (HUMI/HU-UFMA), with a built area of 182.60 m², including the implementation and operation of a temporary waste shelter, the relocations and adjustments of existing infrastructures, notably the new cylinder plant and waste mixer. medicinal gases, the displacement of the LPG plant and network and other interfering networks, in addition to testing, commissioning, assisted operation and delivery of as-built projects, according to the Terms of Reference and Inserts. Single item, CATSER 1619. Execution period of 480 calendar days from the Service Order and validity of 510 calendar days from the signing of the contract. Bidding governed by Law No. 13,303/2016 and the HU Brasil Purchasing and Contracts Regulations (RCC 3.0 – Resolution No. 297/2025), with application of Law No. 14,133/2021 to the electronic public session procedures. Electronic Competition No. 00048/2026, criterion for the best combination of technique and price (70% technique / 30% price – art. 54, III and §5, of Law no. 13,303/2016), closed competition mode and semi-integrated contracting regime (art. 43, V). Minimum publication period of 45 working days (art. 39, III). Confidential estimated budget, in accordance with art. 34 of Law No. 13,303/2016 and art. 30 of RCC 3.0. Not exclusive to ME/EPP. Consortium and partial subcontracting permitted, according to TR. Payment in stages (9 marks), with Result Measurement Indicators (IMR). 5% contractual guarantee and minimum technical guarantee of 60 months after TRD. Appropriation: UG/Gestão 155010/26443, Source PHROSUS, PTRES 234146. SEI Process nº 23523.005368/2026-16.
Related Procurement Opportunities
Similar tenders in Engineering, Healthcare and Medicine, Architecture and Urban Development