Camp pond dam reconstruction project
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Tenders are invited for Camp pond dam reconstruction project
The Project consists generally of the following major items:
• Removing the corrugated metal pipe portion of existing primary spillway, grout and seal off upstream portion of spillway, and demolish and remove existing riser.
• Install cured-in-place pipe for reinforced concrete pipe portion of existing primary spillway for stormwater conveyance from existing catch basins on Richland Drive.
• Removing the existing auxiliary weir and replacing with a weir with an overall length of 75 feet.
• Construct headwall downstream of the cured-in-place pipe.
• Place riprap and grouted riprap to tie in downstream grades and side embankments on downstream slope of Camp Pond Dam towards Richland Creek.
• Place quarry stones in Richland Creek.
Related Procurement Opportunities
Similar tenders in Construction materials, Infrastructure and construction, Engineering