New route Vuisternens – Romont
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The project provides for construction and development work on the new route between Vuisternens-devant-Romont and Romont (km 12,690 – km 15,800). It includes the following objects: - Construction of the platform for the new route (normal track) over ~3.1 km, including water evacuation system, contact line, safety installations, cable trays; - Construction of new structures: -- Viaduc Ste-Anne (L = approx. 985 m); -- Payet Bridge (L = approx.
14 m); -- Mézières Bridge (L = approx. 27 m); -- Pont de la Crêta (L = approx. 120 m); - Creation of new cuts, embankments; - Removal of the existing route (normal track) over ~4 km and existing contact line and safety installation mast supports, including existing level crossings; - Demolition of various small crossing structures on the existing route with the opening of watercourses and recultivation of the route; - Various pipe works (deepening crossings, diversion of pipes parallel to the track, new pipes for third parties, etc.); - Deviation resp. redevelopment of various roads and paths. The subject of the contract is described in detail in the special conditions, exhibit C1 of this call for tenders.