New building of the Hellenic Clinic in Bad Fallingbostel Manufacture in which all the materials used are used
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
New building of the Hellenic Clinic in Bad Fallingbostel Manufacture in which all the materials used are used
The services described in this performance description are essentially: construction site installation; water storage; 122.500 m3 of earth, including upper floors; 15.600 m2 of steel concrete flooring; 11.100.00 m2 steel concrete exterior walls; 15.700.00 m3 steel concrete interior walls, 2.600.00 lfm steel concrete supports; 46.200.00m2 steel-concrete ceilings; 5.300.00 to concrete steel; 4.200.00.m2 of masonry; 1.400.00 Lfm of basic piping; 9.300.00.00 lm of electrical conductors;
Related Procurement Opportunities
Similar tenders in Construction materials, Healthcare Equipment and Services, Engineering