Construction of a power plant for own needs of existing buildings on the territory of Sarafovo port, Kraimorie Marina and Chengene Skele Marina, in three separate positions. Construction of a photovoltaic power plant (PEC) 20kW with a 20kWh battery for own needs on the roof of an existing building with identifier 07079.10.1367.1 under the KKKR of the city of Burgas (Chengene wharf Marina)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
Construction of a power plant for own needs of existing buildings on the territory of Sarafovo port, Kraimorie Marina and Chengene Skele Marina, in three separate positions. Construction of a photovoltaic power plant (PEC) 20kW with a 20kWh battery for own needs on the roof of an existing building with identifier 07079.10.1367.1 under the KKKR of the city of Burgas (Chengene wharf Marina)
Construction of a 20kW photovoltaic power plant (PEC) with a 20kWh battery for own needs on the roof of an existing building with identifier 07079.10.1367.1 under the KKKR of the city of Burgas (Chengene wharf Marina), according to the Technical Specification, an integral part of the public procurement documentation.
Related Procurement Opportunities
Similar tenders in Renewable Energy, Construction materials