Yücekapı (Ağrı) Municipality Solar Power Plant (SPP) Project, Design, Supply and Installation
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
İLBANK - Yücekapı (Ağrı) Municipality Solar Power Plant (SPP) Project, Design, Supply and Installation 13/10/2026 0 INVITATION TO TENDER PUBLIC AND MUNICIPALITY RENEWABLE ENERGY PROJECT (PUMREP) YÜCEKAPI (AĞRI) MUNICIPALITY SOLAR ENERGY POWER PLANT (SPP) PROJECT DESIGN, SUPPLY AND INSTALLATION TENDER / CONTRACT NO: YUCEKAPI-PUMREP-W1 Country: Turkey Project Name: Public and Municipality Renewable Energy Project Contract Title: Yücekapı (Ağrı) Solar Power Plant (SPP) Project Design, Supply and Installation Credit No: P179867 RFB Reference No.: YUCEKAPI-PUMREP-W1 This Tender Announcement was published in the digital issue of Development Business on July 17. It is published following the General Procurement Notification (GPN) No. WB OP00236889, published in 2023. İller Bankası A.Ş. (hereinafter referred to as “Lender or Main Implementor or ILBANK”) has obtained a loan from the World Bank (IBRD) (hereinafter referred to as “Main Creditor or Bank or IBRD”) to be used within the scope of the Public and Municipal Renewable Energy Project (P179867) (hereinafter referred to as “PUMREP”). İller Bankası A.Ş. allocated a part of the loan to Yücekapı Municipality (hereinafter referred to as Employer or Yücekapı Municipality) for the financing of Yücekapı (Ağrı) Solar Power Plant (SPP) Project Design, Supply and Installation (Contract No: YUCEKAPI -PUMREP- W1). Yücekapı Municipality, Yücekapı (Ağrı) Solar Power Plant (SPP) Project Design, Supply The scope of the work is; Yücekapı (Ağrı) Solar Power Plant (SPP) Design, Supply and Installation; Contract period is 150 calendar days, excluding the Defect Liability Period. It will be carried out by national competitive tendering method by issuing a Request for Proposals (RfB) in accordance with the World Bank's "Procurement Rules to be applied by Investment Projects (IPF) Borrowers" (November 2020 revision) and is open to all Bidders as defined in the Procurement Regulations. Interested eligible Bidders can obtain further detailed information by contacting Yücekapı Municipality in person and/or by fax/email at the address below and during business hours (10:00 am to 10:00 am). Interested bidders can review the tender document in writing to the address below.
Related Procurement Opportunities
Similar tenders in Renewable Energy, Energy, Power and Electrical, Banking And Finance