MP-070085 N13 EP02 Mesocco, Northern Sector, design and work management of operating and safety equipment (BSA)
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The “N13 EP02 Mesocco - Comparto Nord” project concerns the maintenance of the motorway section of the N13 between km 26.475 (north junction of Ponte Pregorda) and km 29.800 (Mesocco Nord junction). This call for tenders concerns the resumption as well as the updating of the MP intervention project (phase SIA 32), the development of the tender file (phase SIA 41), the execution project (phase SIA 51), the local management of the works (phase SIA 52) and the commissioning (phase SIA 53) of the works concerning the EES domain. Along this section there are 3 tunnels, 13 retaining walls, 13 engineering structures (of all types), the usual elements of the road layout (water evacuation, surfacing, infrastructure, guardrails, etc.) as well as the road lighting of the “Stazione” and “Valascia” bends. The construction of a multifunctional basin for the treatment of road water is also planned. Coordination with the project author and the local civil engineering works management, as well as with the Project Owner's specialists and third parties is also included in the mandate. The hours planned by the Project Owner, including additional services requested by the MO, are 6,700.