Poland – Sewage, refuse, cleaning and environmental services – Collection and management of waste code 19 12 12
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
PART I 1. As part of the execution of the order, the Contractor will be obliged to: 1.1. Collection and transfer for management of waste code 19 12 12 generated after sorting selectively collected waste code 15 01 06 intended for the production of alternative fuel. 1.2. Waste collection within 7 days at the latest from the time of telephone notification by the Ordering Party's representative. 2. Characteristics of the waste to be collected: 2.1. The estimated amount of waste to be collected during the order period is 500 Mg. The Ordering Party reserves that the given quantity is an estimate, illustrating the possible size of the scope of the subject of the order and may be helpful at the stage of preparing the offer. The ordering party does not have to complete the order in the full amount of the specified amount of waste. The ordering party has the right to complete the order in quantities larger than the estimated quantity. 2.2 Before transport, the above-mentioned waste is stored under a covered storage shelter in compressed bales wrapped with steel wire weighing approximately 500 kg each. 2.3. The estimated amount of waste for one-time transport is approximately 22 to 24 Mg. 3. Organizational and technical requirements for the Contractor: 3.1. The contractor is obliged to have valid permit(s) and decisions regarding transport and waste management with code 19 12 12 throughout the duration of the contract. 3.2. When transporting waste to the waste management site, the Contractor is obliged to comply with the currently applicable regulations on waste transport, occupational health and safety, fire protection, traffic organization and regulations in force in the waste recipient's premises. 3.3. Waste will be loaded by the Ordering Party on working days from Monday to Friday from 7:00 a.m. to 1:00 p.m. 3.4. Arrangements and decisions regarding the execution of the order will be agreed by the Ordering Party with the appointed representative of the Contractor. 3.5. Waste will be weighed on legalized scales of the Ordering Party and the waste recipient. 3.6. Once the waste is handed over to the Contractor, all obligations are transferred to the Contractor, in particular preparing the waste for transport (properly securing the load), delivering the waste to the destination and taking care of the load on the way, and unloading the waste. 3.7. The Contractor must submit to the Ordering Party the registration number obtained from the database on packaging and waste management, the so-called BDO. 4. Terms of settlement between the parties for the service provided: 4.1. In settlement between the parties, the price per will be used
Related Procurement Opportunities
Similar tenders in Healthcare and Medicine, Water and Sanitation, Transportation