Order: Brno, Drobného I – reconstruction of sewerage and water supply
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The subject of the construction works is the reconstruction of the sewerage and water supply in Drobného street, in the section between Erbenova streets, across the intersection with Sportovní and Pionýrská streets to Generála Píky street. The sewer from the years 1901, 1911, 1920 and 1930 will be reconstructed from sewer pipes of the DN 300 profile, 60.77 m long, the DN 400 profile, 627.35 m long, and the DN 600/900 profile, 212.52 m long. From the point of confluence, the existing DN 600/900 sewers and DN 400 sewers will be depth of 2 sections of sewerage made without trenching by pushing through a DN 1600 profile with a length of approx. 53.70 m and pulling in a DN 600/900 profile pipe. Otherwise, the sewers will be built in an open trench. Sewer connections will be replaced in DN 150 profiles with a length of 103.85 m, DN 200 with a length of 152.30 m and DN 250 with a length of 54.87 m. The water lines from 1927 and 1976 will be reconstructed in a DN 150 profile with a total length of 395.33 m. Water connections will be replaced with a total length of 251.20 m. of the building is also the execution of a temporary relocation of the catenary line, due to the execution of works on the sewage system and the water supply line. Place of performance: Brno Procedure regime: mimo režim ZZVZ Awarded to: FIRESTA-Fišer, rekonstrukce, stavby a.s. Awarded contract value: 124,674,294.14 CZK