Germany – Electrical fitting work – High and low current work cryogenic storage - new central laboratory building
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Building 13.58 is a laboratory and research building at the University Hospital Düsseldorf. The building, which has a complete basement, contains previously undeveloped basement areas, which will be converted into a central cryogenic storage facility for research and biosamples as part of the current construction project. Scope of service: Standing distributor width up to 1050mm AV / SV - 2 pieces of laboratory ELT wall distributor height up to 1250mm - 4 pieces of cable tray 400 mm - 292 m parapet duct 2-part - 160 m cable NYM-J 3x1.5 - 5x2.5 mm² - 11,000 m cable NYCWY 4x25/16 mm² -140 m cable NYCWY 4x185/95 mm² - 150 m cable