Romania – Construction work for water and sewage pipelines – Water intake for Water Plant no. 1, Water plant no. 4 and Water Plant no. 5 from the Municipality of Oradea, from the existing intake in the body of the Oșorhei dam, Bihor county
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
For the water supply of the Municipality of Oradea and the consumers in the operating area, it is considered (in addition to the intakes from the existing drains) the realization of an intake from the Fughiu Reservoir and an adduction to the Water Plant no. 5 (and to Water Plant no. 4), respectively of an adduction to Water Plant no. 1. Part of the water captured from the lake will be treated in the treatment station related to Water Plant no. 5, and within the Water Plant no. 1, the water captured from the lake will be used to supply water to the enrichment basins related to the existing drains. Within