Replace Oil Boilers - Cowick Church of England Voluntary Controlled primary School, Snaith Road
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Contract Description
The work will involve the removal and replacement of the existing oil-fired heating boilers and associated plant within the existing boiler house. The works shall include, but not be limited to: • Removal and disposal of existing oil-fired boilers, associated flues and redundant ancillary equipment • Retention of the existing low loss header and secondary heating distribution once leaving the plantroom and pressurisation equipment where serviceable. • Installation of 2no. new high efficiency condensing kerosene-fired boilers complete with flue systems, condensate drainage and associated ancillary equipment. • Replacement of existing boiler shunt pump set and heating circulation pump sets with new high efficiency ECM pumps. • Replacement of the existing boiler control panel and associated controls. • Modification of existing boiler house pipework and oil supply pipework to suit the replacement plant. • Renewal of exposed secondary heating flow and return pipework between the retained low loss header and the points where the services enter the ground for distribution throughout the building. • Removal and replacement of identified classroom radiators/convectors with low surface temperature (LST) radiators. • Associated electrical works, testing, commissioning, flushing, water treatment, balancing and recommissioning of the heating systems. I&F/M/Section 2/ADS/57486 • Provision of all builder’s work, making good, training, operation and maintenance manuals and handover documentation. • Management of the asbestos-containing materials associated with the works. • Liaise with the Client and all stakeholder parties regarding the execution of the scheme. Procurement process: 01B Request for Quote (RFQ)(Restricted invitation only)