Switzerland – Electrical installation work – PWA-T3, T5, T6 (Selective) Electrical tender, BKP 232 low-voltage installations
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
Zurich Airport's infrastructure is undergoing a gradual renewal process. In the last 15 years, various parts of the central airport infrastructure have been extensively renovated and expanded: Dock B was completely rebuilt, Terminal 2 was completely renovated and expanded, and the new security control building with centralized access to the Airside Center was built between Terminals 1 and 2. The central baggage sorting system north of Terminal 1 is currently being expanded and the airport-wide baggage sorting system is being replaced and renewed. In a next one