LIDAR Quality Control Services
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
The North Carolina Geodetic Survey (NCGS), which is administratively located in the Department of Public Safety/North Carolina Emergency Management/ Hazard Mitigation Program Support, intends to award multiple Qualifications-Based Selection (QBS) contracts to qualified private surveying firms (henceforth referred to as the “Vendor”). The scope of this Request for Qualifications (RFQ) covers the services, equipment, personnel, and other resources necessary to perform the work described in the Scope of Work. The specific requirements, specifications, standards, and deliverables applicable to this RFQ are provided in the Scope of Work, Exhibit A. The selection of Vendors will be based on the (1) demonstrated competence, and without regard to cost in accordance with North Carolina General Statute 143-64.31 and (2) qualifications of the Vendor for the professional services required. Thereafter, the State will negotiate a contract for the surveying services described herein with the best-qualified firm. If a contract cannot be negotiated with the best-qualified firm, negotiations with that firm shall be terminated and initiated with the next best-qualified firm. Through the IDIQ contract, HMPS and the newly selected firm will negotiate an overall general scope of surveying services to be provided in support of the State’s program. Then, the State will task services through issuing Delivery Orders under the contract as needed to successfully complete the program. Joint Ventures will not be permitted under this contract. Each Letter of Qualification submitted must designate a firm that will be solely under contract with, and report directly to, HMPS. This firm will be considered the prime firm and, as such, will be responsible for subcontracting with and managing its project team member firms. The project team member firms (subcontractors) will also be subject to HMPS approval and held to the Terms and Conditions defined by the State of North Carolina. Attachment I – Required Elements for Utilization for Federal Funds is