Germany – Architectural, construction, engineering and inspection services – Carrying out the revision of the intersection books in SuedOstLink and SuedLink
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
SuedOstLink is a network expansion project that is planned as an underground cable connection by the two transmission system operators TenneT TSO GmbH and 50Hertz GmbH and is being implemented with a voltage level of 525 KV (direct voltage). The federal government has decided on the need for SuedOstLink and enshrined it in the Federal Requirements Plan Act as projects V5 and V5a. Project V5 runs between Wolmirstedt in Saxony-Anhalt and ISAR near Landshut. It was passed by the Bundestag in 2015 and included in the Federal Requirements Plan Act with a transmission capacity of 2 gigawatts. About the