Poland – Construction work for highways, roads – Continuation of the design and construction of the S19 expressway on the section from the Domaradz junction (without the junction) to the Krosno junction - previously Iskrzynia (without the junction), approx. 12.5 km long
TenderZenith matches this tender's eligibility criteria against your company profile to calculate a deterministic qualification score and identify potential disqualifiers.
A structured breakdown of scope, eligibility requirements, submission steps, and key conditions — extracted directly from the official notice.
Sign in to unlock Bid Fit & AI Opportunity Intelligence
TenderZenith calculates a personalized qualification score against your company profile and extracts structured intelligence from tender documents with your 7-Day Pro Trial (No Credit Card Required).
Description & Project Overview
As part of the order, the design should be continued (including possible optimization in terms of design solutions included in the Construction Design) of the S19 expressway from the Domaradz junction (without the junction) to the Krosno junction - previously Iskrzynia (without the junction), with a length of approximately 12.5 km, on the section from km 45+365.40 to km 57+900 (corresponds to 57+897.54 according to the Design Construction) and perform: • construction of an expressway with a 2x2 cross-section, a lane width of 3.5 m, an emergency lane width of 2.5 m and a dividing lane of 5 m; • dismantling elements of engineering structures and other works not accepted by the Ordering Party
Related Procurement Opportunities
Similar tenders in Roads and Highways, Infrastructure and construction